It didn’t take long on Day 4 to get the call:  We’ve hit water! Judy, Ani, and I quickly piled into the car and rushed down to the Lemuel garden land.           The 6″ casing arrived at the site, but there was difficulty, since the hole had filled in again….

  On Day 3, still at Site 1 (TW1-a), the drilling team began putting the 6″ casing down.     They ran into some trouble while trying to put gravel and clay in the hole to block a salty, upper aquifer.  The guys measured and re-measured with incredible patience trying to make sure everything was…

  The new and improved water dispensing area for the old well at the Lemuel garden land is finished!     Hurricane Matthew had completely flattened the old wall and faucet and buried everything in mud.     Funds donated for hurricane recovery enabled us to get the wall, piping, and faucets set up and…