Taylor ConleyFeb 4, 20192 minDay by Day: Mon, Feb 4Ann sèvi fòs pa nou ak resous pa nou pou chanje kominote pa nou! Let’s use the strength and resources we have to change our community!...
Taylor ConleyMay 1, 20181 minSchool Construction UpdatePrimary School: The second floor is poured, the walls are up, and one staircase is poured! Currently, there is a crew working on the...
Taylor ConleyApr 13, 20182 min“Embrace the impossible…”This week, the construction on the primary school building has been in full swing. We are so thrilled and thankful to see this dream...
Taylor ConleyMar 6, 20181 minRoofs, Karate, and moreLast week, we received old and new friends from Emmanuel Baptist in Exeter, Ontario. The church raised funds towards two roofs: one for...
Taylor ConleyAug 15, 20171 minThe Kindergarten walls are going up!As the new school year fast approaches, we have received a gift to continue construction on the desperately-needed kindergarten building....
Taylor ConleyAug 15, 20171 minThe pump and generator are set up!The pump for the well and the generator to run it have finally arrived and been installed! They have been set up and running for a couple...
Taylor ConleyApr 22, 20173 minMoving Forward, Reaching OutThe Well Project took center stage on the blog over the last couple weeks. But, friends, there have been many other exciting things...
Taylor ConleyApr 6, 20172 minDrilling: Wrapping UpAfter spending the weekend with their families in Port-au-Prince, the well drilling team returned to the Plateau on Monday. They re-blew...
Taylor ConleyApr 1, 20172 minDrilling: Day 4It didn’t take long on Day 4 to get the call: We’ve hit water! Judy, Ani, and I quickly piled into the car and rushed down to the Lemuel...
Taylor ConleyApr 1, 20173 minDrilling: Day 3On Day 3, still at Site 1 (TW1-a), the drilling team began putting the 6″ casing down. They ran into some trouble while trying to put...
Taylor ConleyMar 30, 20171 minDrilling: Day 2Day 2 began with blowing out the drilled, 360-ish-foot hole to clear it of debris and allow the water to come up for better testing....
Taylor ConleyMar 29, 20172 minDrilling: Day 1Although originally slated for Monday afternoon, Day 1 actually turned out to be Tuesday. We began at Site 1, also known to us as TW-1a...
Taylor ConleyMar 26, 20171 minPraying for water: Drilling starts TOMORROWDrill rigs are ready and waiting. Drilling team arrives tomorrow. DRILLING BEGINS TOMORROW AFTERNOON! This morning in church, we set...
Taylor ConleyMar 25, 20171 minFoto Friday: Almost DryThe big water hole is dry…in fact, this picture was taken two weeks ago. BUT, the well drillers are slated to get started on Monday!!...
Taylor ConleyMar 18, 20173 minGuest blog: A first-time perspectiveEnjoy this perspective from Rianna Neels (far right in the photo above), one of the members of the Mount Cheam group who recently visited...
Taylor ConleyMar 12, 20172 minGet Involved: the Fence, Tree-Planting, Garden Project!This week we are hosting a team from Chilliwack, BC, Canada. They are the first group to take on one of our Fence, Tree-Planting, and...
Taylor ConleyMar 3, 20172 minWell Project: We got DATES!Latest news: WE MET THE MATCH for our February matching donation fundraiser! We have signed the contract with the well drilling company,...
Taylor ConleyFeb 26, 20171 minWell Project: Big News to Come!These little boys are getting water out of “the big” water hole in our community. When water is scarce, people sometimes come here from...
Taylor ConleyFeb 16, 20171 minAnd the Community Says…This past Saturday, we held another community meeting to follow up on the Matthew recovery work that has been done. We wanted to share...
Taylor ConleyJan 21, 20171 minMatthew Recovery: Water Dispenser Rebuilt!The new and improved water dispensing area for the old well at the Lemuel garden land is finished! Hurricane Matthew had completely...